Default Metrics Templates

Touchstone includes a set of default metrics templates.

The following are the default metric template groups that are included with the Touchstone installation:

  • Default
    • Advanced: Schedule, cost, performance, risk, earned value metrics.
      • Baseline Compliance
      • Characteristics
      • Completed
      • Constraints
      • Cost
      • Duration
      • Earned Schedule
      • Earned Value
      • Earned Value Work
      • Float
      • In-Progress
      • Lags
      • Logic
      • Planned
      • Risk Exposure
      • Risk Inputs
      • Scenario Comparison
      • Status
      • Work / Resources
  • Industry Standards
    • DCMA 14 Point: Metrics for evaluating a schedule against the DCMA''s 14 Points.
    • GAO: Metrics evaluating compliance to help meet the intent of the GAO Schedule Assessment Guide.
      • 1 Activities
      • 10A Baseline Start
      • 10B Baseline Finish
      • 2 Sequence
      • 3 Resources
      • 4 Duration
      • 5 Integration
      • 6 Critical Path
      • 7 Float
      • 8A Risk Inputs
      • 8B Risk Exposure
      • 9 Dates